Aerys Apply for access

Product / Plan-sheet analyzer

Hand it the bid packet

Commercial work arrives as a PDF nobody wants to read. The scope is buried in it, the quantities are implied, and the deadline is Friday. This reads it and gives you back a scope you can price.

app.aeryssoftware.com

Bid Analyzer

A drawing set, an RFP, a spec, or somebody else’s priced bid

Pro
Documentwestbrook-commons-RFP.pdf · 42 pages
Analyze forInterior Painting, Exterior Painting, Cabinet Refinishing
Cost~100 credits  quoted and confirmed before it runs
You approve the spend first. Nothing runs on a surprise.

You pick which of your services to read it against. Picking nothing reads it against your whole catalog.

By service

One block per service you asked it to read for

Saved to customer
Interior Painting11,200 sqft to price · 48 each to price
11 of 14 lines measured · 3 awaiting a quantity · 2 lines are wall area — shown, not added
Exterior Painting6,840 sqft to price
6 lines measured
Cabinet Refinishing
nothing found — this service was included in the analysis and the document returned no lines for it
The gap is named before the number, every time

No single total, on purpose: walls price by the square foot and doors price each, so one number across them would have no unit and would still look authoritative. Cabinet refinishing is listed even though it found nothing — otherwise you cannot tell “none in this bid” from “the analyzer missed it”.

Import

Line by line, onto your own catalog and your own rates

19 of 20 lines
  • Walls — 7,000 sqftMatched to Interior Painting · Walls · two coats
  • Doors & frames — 48 eachMatched to Interior Painting · Doors
  • Baseboards — 1,050 linear ftHeld back: measured as length, you price by floor area
What imports is priced from your catalog, not from their number

It reads the document; it does not sign off on it. Check anything you are about to bid — the tool says so on the result too.

Drawn from bidServiceTotals (per-service blocks, per-unit subtotals, shortfall-first labels), the surface gate, and the estimate import.

Scope pulled out of the document

It works through the packet and surfaces what is actually being asked for — the walls, trim, doors, ceilings, the quantities, the specifications and the conditions attached to them.

Priced against your catalog

The extracted scope drops into an estimate built from your own services and production rates, so you are reviewing a priced bid rather than starting one.

You still make the call

It does the reading, not the deciding. Everything it pulls out is there to be checked, adjusted and overridden before anything goes out.

Bid more of them

The real cost of a packet that takes two hours to read is the three other bids you did not submit that week.

Questions

What file types can I upload?

PDF plan sheets and bid documents, and photographs of printed pages.

Does it guess at quantities?

It extracts what the document states and flags what it cannot determine, rather than inventing a number you would have to catch.

The rest of the system